sunbeam60

joined 8 months ago
[–] [email protected] 4 points 8 months ago (3 children)

I’m not sure the queue for the 319, 320 and 321 can get any longer. Airbus simply can’t ramp production and it’s not like the C919 is ready for prime time (yet).