Technofrood

joined 1 year ago
[–] [email protected] 1 points 10 months ago

You'd think it would be Surf.

[–] [email protected] 1 points 1 year ago

Yeah that's part of my worry, my gas boiler is 10+years old so needs replacing at some point soon, Id be up for going to a heat pump, but I don't really have the space for it out side. Guess I might just go for a top of the line gas boiler before they stop selling them (I mean I assume they will gradually phase them out so no new installs, only replacements of existing ones, then nope) to cover the next decade and hope for some smaller units.

[–] [email protected] 26 points 1 year ago

Unfortunately most (bigger) services that require a phone number will almost certainly want to validate the phone number so you will need to receive a text or phone call.

[–] [email protected] 11 points 1 year ago* (last edited 1 year ago)

Would be a nice thing to have in the spec for the cable, as those ones aren't compliant with the spec, and can in some cases cause problems, like on disconnect it might be possible for one of the PD pins to short against one of the data pins before the side delivering power has had time to process the disconnect.

It's a pretty specific edge case and I'm sure not a problem most people have had or will run into, but would be nice if it could be part of the spec.

view more: ‹ prev next ›