this post was submitted on 16 Oct 2024
45 points (90.9% liked)

Technology

59374 readers
6264 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 12 points 1 month ago (2 children)

This has been all over the news but I wonder what they really expect. I've never heard of a nuke project anywhere that didn't go years behind schedule and billions over budget. Why do they think it will be different this time?

[–] [email protected] 6 points 1 month ago (1 children)

https://en.m.wikipedia.org/wiki/Small_modular_reactor

These aren't the big beasts powering whole cities. They are designed to be incorporated into a factory or data center just like a diesel or flywheel backup generator.

[–] [email protected] 1 points 1 month ago

I understand the idea but it has been around for decades with no actual deployments so far, so I'll believe it when I see it.

[–] [email protected] 3 points 1 month ago (1 children)

I don't think it matters. By the time the shareholders realise it's a lemon the current leadership team will already have been recycled out and safe from the fallout

[–] [email protected] 1 points 1 month ago

True. I guess utilities do the same thing but they eventually get ratepayer bailouts. Maybe Google will realize that early enough to structure the deals the same way.