this post was submitted on 17 Jun 2024
294 points (97.4% liked)

Ask Lemmy

26875 readers
3256 users here now

A Fediverse community for open-ended, thought provoking questions

Please don't post about US Politics. If you need to do this, try [email protected]


Rules: (interactive)


1) Be nice and; have funDoxxing, trolling, sealioning, racism, and toxicity are not welcomed in AskLemmy. Remember what your mother said: if you can't say something nice, don't say anything at all. In addition, the site-wide Lemmy.world terms of service also apply here. Please familiarize yourself with them


2) All posts must end with a '?'This is sort of like Jeopardy. Please phrase all post titles in the form of a proper question ending with ?


3) No spamPlease do not flood the community with nonsense. Actual suspected spammers will be banned on site. No astroturfing.


4) NSFW is okay, within reasonJust remember to tag posts with either a content warning or a [NSFW] tag. Overtly sexual posts are not allowed, please direct them to either [email protected] or [email protected]. NSFW comments should be restricted to posts tagged [NSFW].


5) This is not a support community.
It is not a place for 'how do I?', type questions. If you have any questions regarding the site itself or would like to report a community, please direct them to Lemmy.world Support or email [email protected]. For other questions check our partnered communities list, or use the search function.


Reminder: The terms of service apply here too.

Partnered Communities:

Tech Support

No Stupid Questions

You Should Know

Reddit

Jokes

Ask Ouija


Logo design credit goes to: tubbadu


founded 1 year ago
MODERATORS
 

Sometimes on Lemmy these seem like the only jobs that actually exist, but I'm sure there's a lot of people here with different and unusual lines of work.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 7 points 5 months ago (3 children)

I helped design large-ish electrical grids. 30-100k cables

Without the actual calculation bits, unfortunately.

Not very interesting. Bad software. Management didn't really care about the problem. I was there so the problem was "managed" from their point of view.

[–] [email protected] 1 points 4 months ago (1 children)
[–] [email protected] 1 points 4 months ago (1 children)

The boring part. Making sure that there are holes in the walls for sockets, enough capacity in the cable trays. Planning the routing, but I didn't have access to algorithm of the software.

Collecting the ever changing inputs from people who want devices with cables in rooms and spaces. :)

[–] [email protected] 1 points 4 months ago

Oh, okay, interesting. I do physical substation design, so there's a lot of overlap there. Just right now I'm slogging through conduit details, lol

load more comments (1 replies)