this post was submitted on 01 Jun 2024
393 points (97.6% liked)

Technology

59312 readers
4649 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

[T]he report's executive summary certainly gets to the heart of their findings.

"The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs," says the report. "But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb."

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 0 points 5 months ago (1 children)

So how much would it cost to do geothermal to power a city? It must be wildly infeasible if I’ve never even heard it mentioned. Can significant electric generation be had from that?

[–] [email protected] 4 points 5 months ago

It's limited in the geography where it could be useful, such as near techtonic plate boundaries. Iceland gets about a quarter of its electricity that way. Some advancements in drilling techniques have made it more viable in more locations.

https://www.jonesday.com/en/insights/2023/05/is-geothermal-energy-making-a-comeback