this post was submitted on 02 Aug 2024
869 points (98.3% liked)

Technology

59421 readers
3944 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 55 points 3 months ago (29 children)

I posted about this a week ago. The battery pack will likely be around 150kWh (Nio has a solid state battery car that will be produced that can do 577 miles on a 150kWh battery). The 9 minute charge is from 8-80% (according to the marketing material I dug up) so it is 432 miles of charge in 9 minutes. Considering fast charge costs like $0.50/kWh currently, I'm guessing most people will not be charging up that entire portion unless they are planning on driving for a long fucking time...after they have already been driving for 9-10 hours.

But that charge rate would have to come from a charger that can output much higher than current ones. The highest output you are likely to find is 350kW which would take 18 minutes to charge that 108kWh. So while this battery can charge that fast, you are not likely to be able to find a charger with that high of output for a few years. Still great to be able to get a couple hundred miles of range in 9 minutes. Solid state batteries supposedly have a quicker ramp up period and can take the full output for a higher percentage of the battery.

[–] [email protected] 20 points 3 months ago (14 children)

There are already some charging stations in Germany offering 400kW. Still 16 minutes though. 800kW is just insane. CCS is currently capped at 500kW, so you would need MCS which is planned for trucks.

[–] [email protected] 9 points 3 months ago (10 children)

Fucking hell, imagine the requirement of a couple of megawatt substation for fast charging, urban power planners must be shitting themselves.

[–] [email protected] 1 points 3 months ago

I think in some years it's considered a common requirement. Just compare it to pipelines. Electricity is way more easily transported and still we built tens of thousands of [preferred unit for distance measurement] of tubes on to the landscape.